Registration | |
Name of the port and city | Port of Lysekil |
Name and number of the pier | Gröto rev 7-8 |
Pier information | |
Max LOA | No LOA or beam restriction, berth can accommodate vessel with length up to about 250 m. Max draft in fairway 10m. |
Max depth | 11 m. |
Type of berth (passenger, cargo, bulk traffic) | Cruise and Cargo |
Fenders available (brand and type) | Tyres. No additional fenders required or recommend. Distance between fenders is 4 m. |
Info on tides | +/- 40 cm. |
Info on wind | Vessels 150-185 15m/s (visibility 1000m) Vessels 185-245 12 – 15m/s (Visibility 100m) Vessels 245 m Individual evaluation. |
Distance to the city center (in Kilometers) | Approximately 1,3 km. Walk to city center quite easy, flat all the way however shuttle service recommended. |
Are shuttle buses required? | No. Shuttle service is recommended. Can be arranged per agreement. |
Distance to the airport (in Kilometers) | The nearest airport to Lysekil is Trollhattan (THN) Airport which is 53.2 km away. Other nearby airports include Gothenburg (GOT) (84.4 km) and Oslo Sandefjord (TRF) (121.6 km) |
Clean pier before arrival + maintenance during the day | Yes, |
ISPS certified - compulsory | The port complies with all international and national regulations regarding ISPS. |
Pilotage service available | Yes. Pilot: One-hour pilotage. |
Proper tender facilities if available and needed by cruise lines | Lysekil southern harbour, several spots available. "Anderssons kaj" most suitable |
Bunkers available | Yes from barge or shoreside. |
Tug available, bollard pull (14 t) | Yes. 1 locally but up to 5 can be requested. Voight-Schneider 57 ton pull. Tugs are not compulsory for arrival or departure. |
Fresh water available - supply rate (30 m3/hour) | Arranged as per needed |
Solid waste disposal | Arranged as per needed |
Toxic waste disposal | Arranged as per needed |
Bilge and Sludge disposal facilities | Arranged as per needed |
Black and grey water disposal facilities | Arranged as per needed |
Necessary space, facilities and labor to handling ship’s stores and provision | Yes. |
Tourism information available at the port | Yes. |
Cruise terminal or tent facilities w/ checkin, luggage and waiting areas) | Tent can be arranged upon request. |
First aid equipment available | Yes. |
Shore gangways available on request | No, ships own gangways . |
Fixed sign / map at the port with directions between port and city | Special city map for cruise visitors can be arranged. |
Taxi stand and general price guidance information | Taxi's can be arranged upon arrival. |
City maps available at pier | City maps can be arranged by tour operator |
Crew designated center available at the port | n/a |
Pier Information related to shore power | |
Is your port currently equipped with shore power? | No |
If NO, do you expect your port to have shore power in operation before 2027? When? | Not currently |
Port reception facilities / Waste handling | |
Direct shore connections available | No |
Number and maximum flow rate | n/a |
Direct downstream to municipal facilities | n/a |
MARPOL standard connections fitted | n/a |
Barges available | n/a |
Number and maximum capacity of barges (cubm) | n/a |
MARPOL standard connections fitted | n/a |
Local storage - Sewage available and maximum capacity (cubm) | Sewage arranged as per needed. |
Port reception facilities / Administration and reporting | |
PWMP - Port Waste Management Plan available and updated for Annex IV special area | Containers arranged as per needed. |
No Special Fee implemented | NSF for waste PRODUCED SINCE LAST PORT. |