NORWAY FINLAND ESTONIA LATVIA LITHUANIA POLAND GERMANY DENMARK SWEDEN Saaremaa Riga Tallinn Gdansk Rostock Sassnitz Oslo Arendal Kristiansand Klaipeda Helsinki Kotka Hamina Turku Mariehamn Stockholm Gothenburg Lysekil Helsingborg Karlskrona Kalmar Malmö Ystad Visby - Gotland Kalundborg Roenne Aalborg Helsingor Aarhus Skagen Fredericia Copenhagen Nyborg
Destinations

Pier Details

Pier information
Max LOA 320 m.
Max depth 10 m.
Type of berth (passenger, cargo, bulk traffic) Cruise berth
Fenders available (brand and type) Yes
Bollard strength 100 t
Info on tides +/- 0,5 meters
Distance to the city center (in Kilometers) 0,4 km
Are shuttle buses required? No
Distance to the airport (in Kilometers) 40 km - Aarhus Airport / 94 km Billund Airport
Clean pier before arrival + maintenance during the day Yes
Good functional fenders Yes
ISPS certified - compulsory Yes
Cleared and well signaled entrance / exit to/ from the pier Yes
Pilotage service available Yes
Proper tender facilities if available and needed by cruise lines Available
Bunkers available Yes
Tug available, bollard pull (14 t) Yes
Fresh water available - supply rate (30 m3/hour) Yes, 30 m3/hour
Solid waste disposal Yes
Toxic waste disposal Yes
Bilge and Sludge disposal facilities Yes
Black and grey water disposal facilities Yes
Necessary space, facilities and labor to handling ship’s stores and provision Yes
Restrooms available Yes
Facilities for handicaps: ramps, toilettes Yes
Tourism information available at the port Yes
First aid equipment available Yes
Fixed sign / map at the port with directions between port and city Yes
Dedicated local cruise network and website Yes
Taxi stand and general price guidance information Yes
City maps available at pier Yes
Crew designated center available at the port Yes
Pier Information related to shore power
Is your port currently equipped with shore power? YES
Which cruise pier(s) (will) offer shore power? Pier 129
Max. LOA and max. draft of the cruise pier(s) that (will) offer shore power 319m LOA
What is the rating of the incoming power to the port from the grid company? Very good
What is the power consumption (MW) supplied? 10 MWh
What is the power range (kVA) supplied? 16MVA (16.000kVA)
What is the voltage range (kV) supplied? 6,6kV or 11kV
What is the frequency (Hz) supplied? 50Hz or 60Hz
Please provide the location of station of the incoming power relative to the desired berth(s) 200 m away from the pier
For connection purposes, does the cruise ship need to dock starboard, port side or is there a flexible set up? Flexible
Are you expecting any limitations on the number of ships/berths supplied simultaneously? Only 1 ship at a time
What is the norm / standard (e.g. IEC/IEEE 80005-1)? IEC/IEEE80005-1
What information and documentation does the cruise ship need to provide the port prior to fist connection? Will be provided to the ships prior
How long does it take to connect from all fast to full operational SSE (shore side electricity) connection? Max 1 hr
Is the disconnection time the same? Max 1 hr
Are there any additional requirements for first-time connection? Standard 1st call procedure
Does the shore power provider guarantee uninterrupted power supply whilst connected? Yes
Are there weather conditions/restrictions or any other type of limitation under which the use of SSE is not possible/safe? No
Are there any penalties in case of failure to connect by the ship? Due to weather, itinerary changes, technical issues, etc. No
Is there an insurance covering any potential damage caused by the SSE? No
What is the current cost per kWh? DKR3,65 per kWh - expected to drop to abt DKR2,65 per KwH in 2024 and even more in 2025. Prices are all inclusive
Are there any costs associated with the Compatibility Assessment/ Testing process? NO
Is there a shore power hook-up fee? DKR9000.- connection/disconnection fee ( total )
Are there any Utility Standard or Usage Fees in addition to kWh rate? No
Are there any other fees related to shore power? TBA
Are there discounts or incentives linked to shore power usage? NO - incentives are given based on total number of calls
Is your berthing policy linked to shore power usage? Ships taking shorepower will be given priority to city near pier 129
How far ahead prior ETA of the vessel do you need confirmation on planned shore-power connection for the vessel? 72 hrs before arrival
Is the energy provided in port generated from renewable sources? 75% in 2023 - 90% in 2024 and 100% by 2025
The manufacturer of the shore-power plant? PowerCon
Who are the entities financing the infrastructure? Port of Aarhus with EU + Municipality support
Port reception facilities / Waste handling
Direct shore connections available N/A
Number and maximum flow rate N/A
Direct downstream to municipal facilities N/A
MARPOL standard connections fitted N/A
Barges available No
Number and maximum capacity of barges (cubm) N/A
MARPOL standard connections fitted N/A
Tank trucks available Yes
Number and maximum capacity of Tank trucks (cubm) 30 t
MARPOL standard connections fitted N/A
Local storage - Sewage available and maximum capacity (cubm) N/A
Local storage - Bioresidue available and maximum capacity (cubm) N/A
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) N/A
Local storage - Food waste reject water available and maximum capacity (cubm) N/A
Port reception facilities / Administration and reporting
PWMP - Port Waste Management Plan available and updated for Annex IV special area Yes
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid Port Spec.
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form N/A
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt N/A
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area No
No Special Fee implemented No
Number of Alleged Inadequacies in 2017 None
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD None