Registration | |
Name and number of the pier | Ndr. Toldbod, Copenhagen |
Pier information | |
Max LOA | 240 m |
Max depth | 7,4 m |
Type of berth (passenger, cargo, bulk traffic) | Passenger |
Fenders available (brand and type) | - |
Bollard strength | 40 ts |
Info on tides | None |
Info on wind | - |
Info on currents | - |
Restrictions | Max LOA 210 m. |
Restrictions cont. | - |
Distance to the city center (in Kilometers) | 3 |
Are shuttle buses required? | No |
Distance to the airport (in Kilometers) | 10 |
Clean pier before arrival + maintenance during the day | Available |
Good functional fenders | Available |
ISPS certified - compulsory | Available |
Cleared and well signaled entrance / exit to/ from the pier | Available |
Pilotage service available | Available |
Proper tender facilities if available and needed by cruise lines | Not available |
Bunkers available | Available |
Solid waste disposal | Available |
Toxic waste disposal | Available |
Bilge and Sludge disposal facilities | Available |
Black and grey water disposal facilities | Available |
Necessary space, facilities and labor to handling ship’s stores and provision | Available |
Restrooms available | Available |
Facilities for handicaps: ramps, toilettes | Not available |
Tourism information available at the port | Available |
Cruise terminal or tent facilities w/ checkin, luggage and waiting areas) | Not available |
X-ray available | Available |
Porters and stevedors available | Available |
First aid equipment available | Not available |
Shore gangways available on request | Not available |
Airline check-in at the port (desirable) | Available |
Parking space for private vehicles | Not available |
Designated and marked parking spaces for vehicles | Not available |
Fixed sign / map at the port with directions between port and city | Not available |
Dedicated local cruise network and website | Available |
Taxi stand and general price guidance information | Available |
City maps available at pier | Available |
Crew designated center available at the port | Not available |
Pier Information related to shore power | |
Is your port currently equipped with shore power? | No |
If NO, do you expect your port to have shore power in operation before 2027? When? | Yes - the shore power facilities are expected to be ready for the cruise season in 2025. |
Which cruise pier(s) (will) offer shore power? | 32 MW/h with 5 connection points. 3 at Oceankaj and 2 at Langelinie. |
Port reception facilities / Waste handling | |
Direct shore connections available | NA |
Barges available | NA |
Tank trucks available | Yes |
Number and maximum capacity of Tank trucks (cubm) | Up to 3 , capacity 30 m3 per lorry |
MARPOL standard connections fitted | Yes |
Local storage - Sewage available and maximum capacity (cubm) | NA |
Local storage - Bioresidue available and maximum capacity (cubm) | NA |
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) | NA |
Local storage - Food waste reject water available and maximum capacity (cubm) | NA |
Port reception facilities / Administration and reporting | |
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid | Port specific |
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form | Yes |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt | Yes |
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area | Yes |
No Special Fee implemented | Yes |
Number of Alleged Inadequacies in 2017 | None |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD | None |