NORWAY FINLAND ESTONIA LATVIA LITHUANIA POLAND GERMANY DENMARK SWEDEN Saaremaa Riga Tallinn Gdansk Rostock Sassnitz Oslo Arendal Kristiansand Klaipeda Helsinki Kotka Hamina Turku Mariehamn Stockholm Gothenburg Lysekil Helsingborg Karlskrona Kalmar Malmö Visby - Gotland Kalundborg Roenne Aalborg Helsingor Aarhus Skagen Fredericia Copenhagen Nyborg
Destinations

Pier Details

Registration
Name and number of the pier Ndr. Toldbod, Copenhagen
Pier information
Max LOA 240 m
Max depth 7,4 m
Type of berth (passenger, cargo, bulk traffic) Passenger
Fenders available (brand and type) -
Bollard strength 40 ts
Info on tides None
Info on wind -
Info on currents -
Restrictions Max LOA 210 m.
Restrictions cont. -
Distance to the city center (in Kilometers) 3
Are shuttle buses required? No
Distance to the airport (in Kilometers) 10
Clean pier before arrival + maintenance during the day Available
Good functional fenders Available
ISPS certified - compulsory Available
Cleared and well signaled entrance / exit to/ from the pier Available
Pilotage service available Available
Proper tender facilities if available and needed by cruise lines Not available
Bunkers available Available
Solid waste disposal Available
Toxic waste disposal Available
Bilge and Sludge disposal facilities Available
Black and grey water disposal facilities Available
Necessary space, facilities and labor to handling ship’s stores and provision Available
Restrooms available Available
Facilities for handicaps: ramps, toilettes Not available
Tourism information available at the port Available
Cruise terminal or tent facilities w/ checkin, luggage and waiting areas) Not available
X-ray available Available
Porters and stevedors available Available
First aid equipment available Not available
Shore gangways available on request Not available
Airline check-in at the port (desirable) Available
Parking space for private vehicles Not available
Designated and marked parking spaces for vehicles Not available
Fixed sign / map at the port with directions between port and city Not available
Dedicated local cruise network and website Available
Taxi stand and general price guidance information Available
City maps available at pier Available
Crew designated center available at the port Not available
Pier Information related to shore power
Is your port currently equipped with shore power? No
If NO, do you expect your port to have shore power in operation before 2027? When? Yes - the shore power facilities are expected to be ready for the cruise season in 2025.
Which cruise pier(s) (will) offer shore power? 32 MW/h with 5 connection points. 3 at Oceankaj and 2 at Langelinie.
Port reception facilities / Waste handling
Direct shore connections available NA
Barges available NA
Tank trucks available Yes
Number and maximum capacity of Tank trucks (cubm) Up to 3 , capacity 30 m3 per lorry
MARPOL standard connections fitted Yes
Local storage - Sewage available and maximum capacity (cubm) NA
Local storage - Bioresidue available and maximum capacity (cubm) NA
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) NA
Local storage - Food waste reject water available and maximum capacity (cubm) NA
Port reception facilities / Administration and reporting
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid Port specific
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form Yes
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt Yes
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area Yes
No Special Fee implemented Yes
Number of Alleged Inadequacies in 2017 None
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD None