Registration | |
Name of the port and city | Port of Roenne |
Name and number of the pier | Krydstogtkajen Pier 31/32 |
Pier information | |
Max LOA | 250 meters |
Max depth | 9 meters |
Type of berth (passenger, cargo, bulk traffic) | Passenger (multi) |
Fenders available (brand and type) | Yes/Vertical |
Info on tides | No tide |
Info on wind | Prevailing western |
Info on currents | Outside the breakwaters- depends of the wind direction |
Restrictions | No |
Restrictions cont. | No |
Distance to the city center (in Kilometers) | About 1,5 km |
Distance to the airport (in Kilometers) | 5 km |
What type of access to the pier (floating pontoon or stairs) | Direct to pier |
Clean pier before arrival + maintenance during the day | Yes |
Good functional fenders | Yes |
ISPS certified - compulsory | Yes |
Cleared and well signaled entrance / exit to/ from the pier | Yes |
Pilotage service available | Available |
Proper tender facilities if available and needed by cruise lines | Yes |
Bunkers available | Available |
Tug available, bollard pull (14 t) | Yes (12 t) |
Fresh water available - supply rate (30 m3/hour) | 60m3 |
Solid waste disposal | Available |
Toxic waste disposal | Available |
Bilge and Sludge disposal facilities | Available (truck) |
Black and grey water disposal facilities | Via pipelines |
Necessary space, facilities and labor to handling ship’s stores and provision | Available |
Restrooms available | Yes/ 200 meter |
Facilities for handicaps: ramps, toilettes | Yes/200 meter |
Tourism information available at the port | Available |
Cruise terminal or tent facilities w/ checkin, luggage and waiting areas) | Welcome tent/ restrooms - 200 meter, free WiFi |
X-ray available | Available |
Porters and stevedors available | Available |
First aid equipment available | Available |
Shore gangways available on request | Not available |
Airline check-in at the port (desirable) | Available |
Parking space for private vehicles | Available |
Designated and marked parking spaces for vehicles | Available |
Fixed sign / map at the port with directions between port and city | Available |
Dedicated local cruise network and website | Yes |
Taxi stand and general price guidance information | Available |
City maps available at pier | Yes |
Crew designated center available at the port | Not available |
Pier Information related to shore power | |
Is your port currently equipped with shore power? | no |
If NO, do you expect your port to have shore power in operation before 2027? When? | no concrete plans to install shore power within the next 5 years, however we are evaluating our possibilities and looking into the feasibility of same. |
Port reception facilities / Waste handling | |
Direct shore connections available | Not available (From 1th of June 2019 Yes - Direct shore connections available) |
Number and maximum flow rate | 100 CUBM/Hour) |
Direct downstream to municipal facilities | Direct shore connections municipal facilities available) |
MARPOL standard connections fitted | Yes |
Barges available | Not available |
MARPOL standard connections fitted | Not available |
Tank trucks available | Yes |
Number and maximum capacity of Tank trucks (cubm) | 25 cubm/Hour |
MARPOL standard connections fitted | Yes 4 inch |
Local storage - Sewage available and maximum capacity (cubm) | 500 CUBM |
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) | 2 CUBM |
Port reception facilities / Administration and reporting | |
PWMP - Port Waste Management Plan available and updated for Annex IV special area | Yes |
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid | Hybrid |
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form | Yes |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt | Yes |
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area | Yes |
No Special Fee implemented | Yes |
Number of Alleged Inadequacies in 2017 | No |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD | No |