NORWAY FINLAND ESTONIA LATVIA LITHUANIA POLAND GERMANY DENMARK SWEDEN Saaremaa Riga Tallinn Gdansk Rostock Sassnitz Oslo Arendal Kristiansand Klaipeda Helsinki Kotka Hamina Turku Mariehamn Stockholm Gothenburg Lysekil Helsingborg Karlskrona Kalmar Malmö Visby - Gotland Kalundborg Roenne Aalborg Helsingor Aarhus Skagen Fredericia Copenhagen Nyborg
Destinations

Pier Details

Registration
Name of the port and city Port of Roenne
Name and number of the pier Krydstogtkajen Pier 31/32
Pier information
Max LOA 250 meters
Max depth 9 meters
Type of berth (passenger, cargo, bulk traffic) Passenger (multi)
Fenders available (brand and type) Yes/Vertical
Info on tides No tide
Info on wind Prevailing western
Info on currents Outside the breakwaters- depends of the wind direction
Restrictions No
Restrictions cont. No
Distance to the city center (in Kilometers) About 1,5 km
Distance to the airport (in Kilometers) 5 km
What type of access to the pier (floating pontoon or stairs) Direct to pier
Clean pier before arrival + maintenance during the day Yes
Good functional fenders Yes
ISPS certified - compulsory Yes
Cleared and well signaled entrance / exit to/ from the pier Yes
Pilotage service available Available
Proper tender facilities if available and needed by cruise lines Yes
Bunkers available Available
Tug available, bollard pull (14 t) Yes (12 t)
Fresh water available - supply rate (30 m3/hour) 60m3
Solid waste disposal Available
Toxic waste disposal Available
Bilge and Sludge disposal facilities Available (truck)
Black and grey water disposal facilities Via pipelines
Necessary space, facilities and labor to handling ship’s stores and provision Available
Restrooms available Yes/ 200 meter
Facilities for handicaps: ramps, toilettes Yes/200 meter
Tourism information available at the port Available
Cruise terminal or tent facilities w/ checkin, luggage and waiting areas) Welcome tent/ restrooms - 200 meter, free WiFi
X-ray available Available
Porters and stevedors available Available
First aid equipment available Available
Shore gangways available on request Not available
Airline check-in at the port (desirable) Available
Parking space for private vehicles Available
Designated and marked parking spaces for vehicles Available
Fixed sign / map at the port with directions between port and city Available
Dedicated local cruise network and website Yes
Taxi stand and general price guidance information Available
City maps available at pier Yes
Crew designated center available at the port Not available
Pier Information related to shore power
Is your port currently equipped with shore power? no
If NO, do you expect your port to have shore power in operation before 2027? When? no concrete plans to install shore power within the next 5 years, however we are evaluating our possibilities and looking into the feasibility of same.
Port reception facilities / Waste handling
Direct shore connections available Not available (From 1th of June 2019 Yes - Direct shore connections available)
Number and maximum flow rate 100 CUBM/Hour)
Direct downstream to municipal facilities Direct shore connections municipal facilities available)
MARPOL standard connections fitted Yes
Barges available Not available
MARPOL standard connections fitted Not available
Tank trucks available Yes
Number and maximum capacity of Tank trucks (cubm) 25 cubm/Hour
MARPOL standard connections fitted Yes 4 inch
Local storage - Sewage available and maximum capacity (cubm) 500 CUBM
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) 2 CUBM
Port reception facilities / Administration and reporting
PWMP - Port Waste Management Plan available and updated for Annex IV special area Yes
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid Hybrid
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form Yes
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt Yes
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area Yes
No Special Fee implemented Yes
Number of Alleged Inadequacies in 2017 No
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD No