Registration | |
Date completed | 14.04.2021 |
Completed by (name and position) | Cruise Manager Anne Sofie Rønne Jensen |
Name of the port and city | Skagen |
Name and number of the pier | Pier 10 |
Pier information | |
Max LOA | 220 m |
Max depth | 9 m |
Type of berth (passenger, cargo, bulk traffic) | Mixed use facility |
Fenders available (brand and type) | Rubber tires pls. see photo attached |
Bollard strength | 50T |
Info on tides | 0.5 m |
Info on wind | Up to 15 m/s |
Info on currents | Up to 1 knot |
Restrictions | N/A |
Restrictions cont. | N/A |
Distance to the city center (in Kilometers) | 1.6 km. |
Are shuttle buses required? | No, but recommended. Port of Skagen offers one complimentary shuttle bus per cruise ships call. |
Distance to the airport (in Kilometers) | 100 km Aalborg Airport |
What type of access to the pier (floating pontoon or stairs) | Ship's gangway |
Clean pier before arrival + maintenance during the day | Available |
Good functional fenders | Available |
ISPS certified - compulsory | Yes |
Cleared and well signaled entrance / exit to/ from the pier | Yes |
Pilotage service available | Available but not compulsory |
Proper tender facilities if available and needed by cruise lines | Not available |
Bunkers available | Available |
Tug available, bollard pull (14 t) | 7.5 BP, 18 BP and 28 BP |
Fresh water available - supply rate (30 m3/hour) | Yes, Delivered from pier by shore hoses |
Solid waste disposal | Available |
Toxic waste disposal | Available |
Bilge and Sludge disposal facilities | Available |
Black and grey water disposal facilities | Available |
Necessary space, facilities and labor to handling ship’s stores and provision | Available |
Restrooms available | Available |
Facilities for handicaps: ramps, toilettes | Available |
Tourism information available at the port | Available |
Cruise terminal or tent facilities w/ checkin, luggage and waiting areas) | Not available but reception facilities |
X-ray available | Not available |
Porters and stevedors available | Not available |
First aid equipment available | Yes |
Shore gangways available on request | Not available |
Airline check-in at the port (desirable) | Not available |
Parking space for private vehicles | Available |
Designated and marked parking spaces for vehicles | Available |
Fixed sign / map at the port with directions between port and city | Available |
Dedicated local cruise network and website | Available - www.cruiseskagen.dk |
Taxi stand and general price guidance information | Available |
City maps available at pier | Available |
Crew designated center available at the port | Available |
Pier Information related to shore power | |
Is your port currently equipped with shore power? | No |
If NO, do you expect your port to have shore power in operation before 2027? | Yes |
If you have shore power now or before 2027, please state which cruise pier(s) (will) offer shore power? | Krydstogtkajen - Pier 9 |
If you have shore power now or before 2027, please provide max. LOA and max. draft of the cruise pier(s) that (will) offer shore power | Max LOA 400m. Max draft 11.5 m |
Port reception facilities / Waste handling | |
Direct shore connections available | Yes |
Number and maximum flow rate | 200 cbm / hour |
Direct downstream to municipal facilities | Yes - via 800 cbm buffer tank |
MARPOL standard connections fitted | Yes |
Barges available | N/A |
Number and maximum capacity of barges (cubm) | N/A |
MARPOL standard connections fitted | N/A |
Tank trucks available | Yes |
Number and maximum capacity of Tank trucks (cubm) | 2 - No upper limit |
MARPOL standard connections fitted | N/A |
Local storage - Sewage available and maximum capacity (cubm) | Yes - no limit |
Local storage - Bioresidue available and maximum capacity (cubm) | Yes - trucks |
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) | Yes - trucks |
Local storage - Food waste reject water available and maximum capacity (cubm) | Yes - trucks |
Port reception facilities / Administration and reporting | |
PWMP - Port Waste Management Plan available and updated for Annex IV special area | Yes |
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid | Port Specific |
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form | N/A |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt | N/A |
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area | Yes |
No Special Fee implemented | Yes, up to a certain amount |
Number of Alleged Inadequacies in 2017 | None |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD | None |