NORWAY FINLAND ESTONIA LATVIA LITHUANIA POLAND GERMANY DENMARK SWEDEN Saaremaa Riga Tallinn Gdansk Rostock Sassnitz Oslo Arendal Kristiansand Klaipeda Helsinki Kotka Hamina Turku Mariehamn Stockholm Gothenburg Lysekil Helsingborg Karlskrona Kalmar Malmö Visby - Gotland Kalundborg Roenne Aalborg Helsingor Aarhus Skagen Fredericia Copenhagen Nyborg
Destinations

Pier Details

Pier information
Max LOA 300 meters
Type of berth (passenger, cargo, bulk traffic) Passenger
Fenders available (brand and type) Yes, Panel fenders (rubber fender and resilient fender)
Info on tides 20 cm, 1,5 knots
Info on wind See weather forecast 2-3 days ahead, www.smhi.se
Info on currents 0,2-1 knots
Clean pier before arrival + maintenance during the day Available
Good functional fenders Available
ISPS certified - compulsory Available
Cleared and well signaled entrance / exit to/ from the pier Available
Pilotage service available Available
Proper tender facilities if available and needed by cruise lines Not available
Bunkers available Available
Solid waste disposal Available by barge
Toxic waste disposal Available
Bilge and Sludge disposal facilities Available
Necessary space, facilities and labor to handling ship’s stores and provision Available
Restrooms available Available
Facilities for handicaps: ramps, toilettes Available
Tourism information available at the port Available
Cruise terminal or tent facilities w/ checkin, luggage and waiting areas) Available
X-ray available Not available (on request)
Porters and stevedors available Not available (on request)
First aid equipment available Available
Shore gangways available on request Available
Airline check-in at the port (desirable) Not available
Parking space for private vehicles Not available
Pier Information related to shore power
Is your port currently equipped with shore power? No
If NO, do you expect your port to have shore power in operation before 2027? When? Yes, Port of Gothenburg is working on a mobile shore power concept.
Port reception facilities / Waste handling
Direct shore connections available Yes
Number and maximum flow rate Three, 200 cbm/h
Direct downstream to municipal facilities Yes
MARPOL standard connections fitted Yes
Barges available Yes
Number and maximum capacity of barges (cubm) One. The barge is available with a maximum capacity of 450 cb
MARPOL standard connections fitted Yes
Tank trucks available NA
Number and maximum capacity of Tank trucks (cubm) NA
MARPOL standard connections fitted NA
Local storage - Sewage available and maximum capacity (cubm) The cruise ship can discharge sewage during their time at berth via barge.
Local storage - Bioresidue available and maximum capacity (cubm) The terminal in the Port of Gothenburg accept all the waste that vessels need to leave ashore that has arisen during the vessels normal operation accordance with the "No special fee system".
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) The terminal in the Port of Gothenburg accept all the waste that vessels need to leave ashore that has arisen during the vessels normal operation accordance with the "No special fee system".
Local storage - Food waste reject water available and maximum capacity (cubm) The terminal in the Port of Gothenburg accept all the waste that vessels need to leave ashore that has arisen during the vessels normal operation accordance with the "No special fee system".
Port reception facilities / Administration and reporting
PWMP - Port Waste Management Plan available and updated for Annex IV special area Yes
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid Port
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form Waste declaration in Sweden shall be sent in digital form together with vessel notification in Maritime Single Window at last 24 h prior arrival.
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt Yes
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area No
No Special Fee implemented Yes
Number of Alleged Inadequacies in 2017 None
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD None