Registration | |
Date completed | 2023-06-05 |
Name of the port and city | Port of Mariehamn/ Town of Mariehamn |
Name and number of the pier | Quay 1-2 |
Pier information | |
Max LOA | Lenght of quay: 250 m, max lenght of vessel: 220 m |
Max depth | 7,1 meters |
Type of berth (passenger, cargo, bulk traffic) | Passenger |
Fenders available (brand and type) | fixed concreate, with rubber panels and steel shield |
Info on tides | N/A |
Info on wind | www.ilmatieteenlaitos.fi |
Info on currents | N/A |
Restrictions | Regular traffic of ferries |
Distance to the city center (in Kilometers) | 900 m |
Are shuttle buses required? | No |
Distance to the airport (in Kilometers) | 5 km |
Clean pier before arrival + maintenance during the day | Available |
Good functional fenders | Available |
ISPS certified - compulsory | Available |
Cleared and well signaled entrance / exit to/ from the pier | Available |
Pilotage service available | Available |
Proper tender facilities if available and needed by cruise lines | Not available |
Bunkers available | Available |
Fresh water available - supply rate (30 m3/hour) | Yes |
Solid waste disposal | Available |
Toxic waste disposal | Available |
Bilge and Sludge disposal facilities | Available |
Black and grey water disposal facilities | Available |
Necessary space, facilities and labor to handling ship’s stores and provision | Available |
Restrooms available | Not available |
Facilities for handicaps: ramps, toilettes | Available |
Tourism information available at the port | Available |
Shore gangways available on request | Not available |
Designated and marked parking spaces for vehicles | Not available |
Fixed sign / map at the port with directions between port and city | Available |
Dedicated local cruise network and website | Not available |
Taxi stand and general price guidance information | Available |
City maps available at pier | Available |
Crew designated center available at the port | Not available |
Pier Information related to shore power | |
Is your port currently equipped with shore power? | No |
If NO, do you expect your port to have shore power in operation before 2027? When? | Yes, 2027 |
Which cruise pier(s) (will) offer shore power? | Quay 1-2 |
Max. LOA and max. draft of the cruise pier(s) that (will) offer shore power | Max LOA 220 m max draft: 7,1 m |
What is the rating of the incoming power to the port from the grid company? | Not known at this planningstage |
What is the power consumption (MW) supplied? | Not known at this planningstage |
What is the power range (kVA) supplied? | Not known at this planningstage |
What is the voltage range (kV) supplied? | Not known at this planningstage |
What is the frequency (Hz) supplied? | Not known at this planningstage |
For connection purposes, does the cruise ship need to dock starboard, port side or is there a flexible set up? | Not known at this planningstage |
Are you expecting any limitations on the number of ships/berths supplied simultaneously? | We can take only one cruise vessel at the time because of other factors |
What is the norm / standard (e.g. IEC/IEEE 80005-1)? | Not known at this planningstage |
Is there a shore power hook-up fee? | Not known at this planningstage |
Port reception facilities / Waste handling | |
Direct shore connections available | Yes, for sewage |
Number and maximum flow rate | 1 | 30 m3/h |
Direct downstream to municipal facilities | Yes |
MARPOL standard connections fitted | No |
Barges available | No |
Number and maximum capacity of barges (cubm) | NA | NA |
MARPOL standard connections fitted | No |
Tank trucks available | No |
Number and maximum capacity of Tank trucks (cubm) | NA | NA |
MARPOL standard connections fitted | No |
Local storage - Sewage available and maximum capacity (cubm) | Yes | unlimited |
Local storage - Bioresidue available and maximum capacity (cubm) | Yes | unlimited |
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) | Yes | unlimited |
Local storage - Food waste reject water available and maximum capacity (cubm) | Yes | unlimited |
Port reception facilities / Administration and reporting | |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt | Yes |
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area | No |
No Special Fee implemented | Yes |
Number of Alleged Inadequacies in 2017 | None |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD | NA |