NORWAY FINLAND ESTONIA LATVIA LITHUANIA POLAND GERMANY DENMARK SWEDEN Saaremaa Riga Tallinn Gdansk Rostock Sassnitz Oslo Arendal Kristiansand Klaipeda Helsinki Kotka Hamina Turku Mariehamn Stockholm Gothenburg Lysekil Helsingborg Karlskrona Kalmar Malmö Visby - Gotland Kalundborg Roenne Aalborg Helsingor Aarhus Skagen Fredericia Copenhagen Nyborg
Destinations

Pier Details

Registration
Date completed 17.8.2022
Completed by (name and position) Antti Pekanheimo, Chief Operating Officer Annika Schulman, Executive Assistant
Name of the port and city Port of Turku, Turku
Name and number of the pier Pier 23
Pier information
Max LOA 220m
Max depth 8m
Type of berth (passenger, cargo, bulk traffic) Container / Cruise
Fenders available (brand and type) Rubber etc.
Bollard strength 75+100 tons
Info on tides No tide
Info on wind Can be received from Turku Port Control
Info on currents Can be received from Turku Port Control
Restrictions Traffic restrictions information from Archipelago VTS
Distance to the city center (in Kilometers) 3km
Are shuttle buses required? Yes, complimentary
Distance to the airport (in Kilometers) 11km
Clean pier before arrival + maintenance during the day Available
Good functional fenders Available
ISPS certified - compulsory Yes
Cleared and well signaled entrance / exit to/ from the pier Available
Pilotage service available Available
Proper tender facilities if available and needed by cruise lines Available
Bunkers available Available
Fresh water available - supply rate (30 m3/hour) Available
Solid waste disposal Available
Toxic waste disposal Available
Bilge and Sludge disposal facilities Available
Black and grey water disposal facilities Available
Tourism information available at the port Available
Cruise terminal or tent facilities w/ checkin, luggage and waiting areas) Available
Porters and stevedors available Available
First aid equipment available Available
Shore gangways available on request Available
Parking space for private vehicles Available
Designated and marked parking spaces for vehicles Available
Fixed sign / map at the port with directions between port and city Available
Dedicated local cruise network and website Available
City maps available at pier Available
Pier Information related to shore power
Is your port currently equipped with shore power? No
If NO, do you expect your port to have shore power in operation before 2027? When? Maybe in some piers
What information and documentation does the cruise ship need to provide the port prior to fist connection? No need
Port reception facilities / Waste handling
Direct shore connections available yes
Number and maximum flow rate 85 cubm/h
Direct downstream to municipal facilities yes
MARPOL standard connections fitted yes
Barges available no
Tank trucks available yes
MARPOL standard connections fitted yes
Port reception facilities / Administration and reporting
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid Port
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form yes
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt yes
No Special Fee implemented yes
Number of Alleged Inadequacies in 2017 0
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD 0