Registration | |
Date completed | 17.8.2022 |
Completed by (name and position) | Antti Pekanheimo, Chief Operating Officer Annika Schulman, Executive Assistant |
Name of the port and city | Port of Turku, Turku |
Name and number of the pier | Pier 25 |
Pier information | |
Max LOA | 240m |
Max depth | 8m |
Type of berth (passenger, cargo, bulk traffic) | Container / Cruise |
Fenders available (brand and type) | Rubber etc. |
Bollard strength | 75+100 tons |
Info on tides | No tide |
Info on wind | Can be received from Turku Port Control |
Info on currents | Can be received from Turku Port Control |
Restrictions | Traffic restrictions information from Archipelago VTS |
Distance to the city center (in Kilometers) | 3km |
Are shuttle buses required? | Yes, complimentary |
Distance to the airport (in Kilometers) | 11km |
Clean pier before arrival + maintenance during the day | Available |
Good functional fenders | Available |
ISPS certified - compulsory | Yes |
Cleared and well signaled entrance / exit to/ from the pier | Available |
Pilotage service available | Available |
Proper tender facilities if available and needed by cruise lines | Available |
Bunkers available | Available |
Fresh water available - supply rate (30 m3/hour) | Yes |
Solid waste disposal | Available |
Toxic waste disposal | Available |
Bilge and Sludge disposal facilities | Available |
Black and grey water disposal facilities | Available |
Tourism information available at the port | Available |
Cruise terminal or tent facilities w/ checkin, luggage and waiting areas) | Available |
Porters and stevedors available | Available |
First aid equipment available | Available |
Shore gangways available on request | Available |
Parking space for private vehicles | Available |
Designated and marked parking spaces for vehicles | Available |
Fixed sign / map at the port with directions between port and city | Available |
Dedicated local cruise network and website | Available |
City maps available at pier | Available |
Pier Information related to shore power | |
Is your port currently equipped with shore power? | No |
If NO, do you expect your port to have shore power in operation before 2027? When? | Maybe in some piers |
What information and documentation does the cruise ship need to provide the port prior to fist connection? | No need |
Port reception facilities / Waste handling | |
Direct shore connections available | yes |
Number and maximum flow rate | 85 cubm/h |
Direct downstream to municipal facilities | yes |
MARPOL standard connections fitted | yes |
Barges available | no |
Tank trucks available | yes |
MARPOL standard connections fitted | yes |
Port reception facilities / Administration and reporting | |
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid | Port |
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form | yes |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt | yes |
No Special Fee implemented | yes |
Number of Alleged Inadequacies in 2017 | 0 |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD | 0 |