Destinations

Port Reception Facilities - Helsingor

Registration
Date completed 5-10 2017
Completed by (name and position) Jan Hjort Christensen
Name of the port and city Elsinore
Name and number of the pier Kings Quay/ Berth no. 3
Waste handling facilities
Direct shore connections available Yes
Number and maximum flow rate 1/ships pumps (max pressur)
Direct downstream to municipal facilities Yes
MARPOL standard connections fitted Yes
Barges available 0
Number and maximum capacity of barges (cubm)
MARPOL standard connections fitted
Tank trucks available 1 or 2
Number and maximum capacity of Tank trucks (cubm) 35
MARPOL standard connections fitted Yes
Local storage - Sewage available and maximum capacity (cubm) 0
Local storage - Bioresidue available and maximum capacity (cubm) 0
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) 0
Local storage - Food waste reject water available and maximum capacity (cubm) 8
Administration and Reporting
PWMP - Port Waste Management Plan available and updated for Annex IV special area Yes
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form No
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt No
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area
No Special Fee implemented Yes
Number of Alleged Inadequacies in 2017 0
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD 0