Direct shore connections available |
Potwater |
Number and maximum flow rate |
30 m3/h |
Direct downstream to municipal facilities |
Yes |
MARPOL standard connections fitted |
International standard |
Barges available |
None, have to be ordered |
Number and maximum capacity of barges (cubm) |
None, have to be ordered |
MARPOL standard connections fitted |
None, have to be ordered |
Tank trucks available |
Yes |
Number and maximum capacity of Tank trucks (cubm) |
To be ordered |
MARPOL standard connections fitted |
To be ordered |
Local storage - Sewage available and maximum capacity (cubm) |
By tanktruck |
Local storage - Bioresidue available and maximum capacity (cubm) |
By tanktruck |
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) |
By tanktruck |
Local storage - Food waste reject water available and maximum capacity (cubm) |
By tanktruck |
PWMP - Port Waste Management Plan available and updated for Annex IV special area |
Yes |
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid |
Port specific |
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form |
Yes |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt |
On request |
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area |
On requests |
No Special Fee implemented |
Yes |
Number of Alleged Inadequacies in 2017 |
0 |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD |
0 |