Direct shore connections available |
NO,
”Port reception facilities” at pier – Capacity 300 cbm/h (One ship)
Capacity 2x150 cbm/h when two vessels at pier. |
Number and maximum flow rate |
N/A |
Direct downstream to municipal facilities |
N/A |
MARPOL standard connections fitted |
N/A |
Barges available |
NO |
Tank trucks available |
YES |
Number and maximum capacity of Tank trucks (cubm) |
9m3/truck |
MARPOL standard connections fitted |
YES |
Local storage - Sewage available and maximum capacity (cubm) |
No limit ( from last port ) |
Local storage - Bioresidue available and maximum capacity (cubm) |
No limit ( from last port ) |
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) |
0 |
Local storage - Food waste reject water available and maximum capacity (cubm) |
0 |
PWMP - Port Waste Management Plan available and updated for Annex IV special area |
YES |
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid |
Port |
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form |
YES |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt |
YES |
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area |
NO |
No Special Fee implemented |
YES |
Number of Alleged Inadequacies in 2017 |
NO |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD |
N/A |