Number and maximum flow rate |
2 / 30cubm/h |
Direct downstream to municipal facilities |
Yes |
MARPOL standard connections fitted |
Yes |
Number and maximum capacity of barges (cubm) |
N/A |
MARPOL standard connections fitted |
N/A |
Tank trucks available |
Yes for sludge |
Number and maximum capacity of Tank trucks (cubm) |
Several / 40cubm (sludge) |
MARPOL standard connections fitted |
Yes |
Local storage - Sewage available and maximum capacity (cubm) |
N/A |
Local storage - Bioresidue available and maximum capacity (cubm) |
N/A |
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) |
N/A |
Local storage - Food waste reject water available and maximum capacity (cubm) |
N/A |
PWMP - Port Waste Management Plan available and updated for Annex IV special area |
Yes |
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid |
Hybrid |
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form |
Yes |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt |
Yes |
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area |
4/28/2016 |
No Special Fee implemented |
Yes |
Number of Alleged Inadequacies in 2017 |
None |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD |
None |