Direct shore connections available |
yes |
Number and maximum flow rate |
3 / 140 cubm/h |
Direct downstream to municipal facilities |
yes |
MARPOL standard connections fitted |
yes |
Barges available |
/ |
Number and maximum capacity of barges (cubm) |
/ |
MARPOL standard connections fitted |
/ |
Tank trucks available |
yes |
Number and maximum capacity of Tank trucks (cubm) |
depends |
Local storage - Sewage available and maximum capacity (cubm) |
/ |
Local storage - Bioresidue available and maximum capacity (cubm) |
/ |
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) |
/ |
Local storage - Food waste reject water available and maximum capacity (cubm) |
/ |
PWMP - Port Waste Management Plan available and updated for Annex IV special area |
yes |
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid |
yes |
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form |
yes |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt |
yes |
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area |
yes |
No Special Fee implemented |
yes |
Number of Alleged Inadequacies in 2017 |
/ |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD |
/ |