Direct shore connections available |
YES |
Number and maximum flow rate |
200 m3/h |
Direct downstream to municipal facilities |
YES |
MARPOL standard connections fitted |
YES |
Barges available |
NO |
Number and maximum capacity of barges (cubm) |
N/A |
MARPOL standard connections fitted |
N/A |
Tank trucks available |
YES |
Number and maximum capacity of Tank trucks (cubm) |
50 m3/h |
MARPOL standard connections fitted |
YES |
Local storage - Sewage available and maximum capacity (cubm) |
YES, NO LIMITATIONS |
Local storage - Bioresidue available and maximum capacity (cubm) |
YES, NO LIMITATIONS |
Local storage - Fats, Oils from Hotel services available and maximum capacity (cubm) |
YES, NO LIMITATIONS |
Local storage - Food waste reject water available and maximum capacity (cubm) |
YES, NO LIMITATIONS |
PWMP - Port Waste Management Plan available and updated for Annex IV special area |
YES |
Type of PWMP - Port specific, Terminal/Pier specific or Hybrid |
HYBRID |
Implemented Cruise specific Circ.644 - ANF Advanced Notification Form |
NO |
Implemented Cruise specific Circ.645 - WDR Waste Delivery Receipt |
NO |
Updated IMO Port Reception Facilities Database (PRFD) for Annex IV special area |
NO |
No Special Fee implemented |
YES |
Number of Alleged Inadequacies in 2017 |
0 |
Number of Alleged Inadequacies in 2017 cleared within the IMO PRFD |
N/A |